Mould Manufacturers and Factories

Home Mould Products Mold Injection Parts

Mold Injection Parts

Mold Injection Parts
Price: Negotiable
Trade Terms: FOB
Min Order: 1 /Piece
Pay Type: L/C,T/T,Western Union
Packaging & Delivery
Packaging Detail: Wooden case or according to customers' requirement
Delivery Detail: 15-30 days

Specifications
Plastic injection moulded parts
Mould Material: P20, S136H, and 718H
Hot Runner
Mould life Gurantee: 300, 000 shot

Plastic injection moulded parts

1 Material: P20, S136H, 718H

2 Cavity: Single or Multi

3 Runner: Hot/cold runner

4 Mould base: Standard base

5 Mould life: 300, 000 shots

From your ideas to reality, we control all procedures by exactitude attitude and details to avoid any design mistakes and wasting your time on unnecessary events.
We guarantee that doing our best to make your products perfect in the shortest time whatever flawless product shape, precise size for assembly, parts assembly, mold assembly, or every product design detail.

1. Customer provides 2D drawing, 3D drawing or samples.

2. To discuss the product function, the shape, material, and other demands between customers and our engineers.

3. According the information, to process choosing plastic and mold material, mold making process, and quotation.

4. If quotation is ok and confirmed, we will do product and mold 3D drawing modification, and injection moldflow analyze.

5. We will send 3D drawing to customers to do final confirmation.

6. If there is any question, to modify the drawing and confirm again.

7. Drawing Checking is ok. We will process making hand-made samples, if need.

8. After samples making, we will process product confirmation and function testing.

9. Sample checking is ok, and we will process preparing material and mold making processing.

10. If sample is not necessary, we will process preparing material and mold making processing.

11. Mold making process, Planer/Shaper, Milling, Grinding, Drilling, CNC Milling, Texts, EDM, Lathe, Polish, Heat treatment, Cr. Coating, Texture, Mold assembly.

12. After mold finished, we will process injection testing.

13. If the situation is not good for injection, we will modify on problems.

14. After modifying, we will test again.

15. Testing is ok. Customers confirm the final samples. We will produce by mass production.

16. After mass production, we will process product assembly and packing.

17. Shipment.

Now mold drawing, we use CAD system in place of paper drawing. It can decrease the mistakes and is more precise and easy to correct. The mold flow analyze system can simulate the injection material, cavity location, and size to analyze all kinds injection situation. We can avoid all big design problems.
The following pictures are an easy example of 3D moldflow analyze situation.

After drawing process, it is entering the mold making process. In order to keep all flow paths on time, we are good at control all process's time and arrange the order of making. It can take you less time for product development in the best efficient.
To do a good job, one must first sharpen one's tools. If we have excellent technology, we also need good machine to collocate. It can improve our mold and product quality.

The following pictures are the machine which we use in making process.

We can provide you a wide variety of product categories. For example, high precision products, medical instruments, electronic products, consumer's products, hardware products, stationery products.
Markets: North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe
Shaping Mode: Injection Mould
Tianga mold&plastic parts Co., Ltd., established office in Shanghai, which is a member of Chinese Heavy Machinery Industry. We trade molds and plastic parts in the world. Fuyiji has 7 branches in China up to now. The company manufacturing headquarters located in Shanghai, existing staffs of more than 1, 000 people, including senior technical and managerial personnel of more than 50 people. Our current product specifications are all types of molds and plastic parts with more than 2000 models and production value of nearly 700 million. The company has strong capabilities of technical development and design, with advanced manufacturing technique, sophisticated equipment, and complete detection means. In 2002, the company owned ISO9001-2000 version international quality system certification at one time. Our products are widely used in metallurgy, heavy-duty mining machinery, port machinery,

Paper-making machinery, chemicals, petroleum, cement, coal and other industries. They are designated by Chinese Heavy Machinery Association grinding branch.

Send your message to this manufacturer

  • Tianga Mold & Plastic Parts Manufacturer

More >

Other Mould Products with This Manufacturers

About Us Mould Products Mould Manufacturers Hot Mould Mould News Mould Trade Shows Site Partners Contact Us Sitemap